Case Studies

Recent projects include;

ahu.png

Energy Reduction

We performed an energy efficiency exercise on a large volume manufacturing facility. Achievements included validated, energy savings of £970,000/year through voltage optimization, electrical base-load reduction, photo-voltaic system enhancement, air conditioning & LEV re-commissioning.

DSC02788.JPG

Recycling Centre Build

Our client required a state of the art recycling facility to process it’s waste streams in-house whilst maximizing revenue. We managed the design, construction, infrastructure & equipment installation, commissioning and handover to the operations team. Project cost approximately £250,000, three month duration.

 

Temporary Effluent collection tank.JPG

Drainage Design

We specified and supervised commissioning of a full drainage pollution control scheme for a 250,000m2 brown-field construction project. Facilities included surface water oil water interceptors, automatic penstocks, vehicle wash down & gully facilities with foul interceptors and silt controls during construction, including communication links to a central building management system.