Let It Rain!

Construction surface water management design involved the excavation of a perimeter ditch around the boundary of the site prior to diverting flows into the channel. In addition to undertaking the main diversion works it was also necessary to provide appropriate temporary infrastructure on site to deal with surface water during the construction period. Including appropriate attenuation and water quality control.

Luay Zayed